[1]
Bhatti, S., Haider, F. and Siddiqui, U.A. 2022. Construction Delays and Project Failures due to the Biological Pandemic of COVID-19 and Lockdown Effects. Sir Syed University Research Journal of Engineering & Technology. 12, 1 (Jun. 2022), 64–69. DOI:https://doi.org/10.33317/ssurj.287.